Description of Tesco project: 5 roof-top heat pumps 645 kW – for heating 860 kW – for cooling
130 pcs, 100 m depth BHE = 13.000 m total length
30 kW electricity production by microturbine, its waste heat utilized for water heating (DHW)
Permanent cooling performance supported by absorption chiller towards the bakery
Unused heat energy feeded back into the BHE system
There is monitoring system due to examination of sustainability!