Telefon:+36-20-9729663
E-mail:adam@hgd.hu
Elérhetõségek
  • English
  • Deutsch
  • Magyar
Reine Energie Reinertrag

School and Sport Centre

There was a state-subsidized heat pump project in Törökbálint in 2010. The design and installation has been made by the HGD Ltd. We joined to Swietelsky Ltd. in the construction and we started to drill 18.000 m BHE system in August 2010. The planned heating and cooling capacity is 700 kW and 760 kW.

Angewandte Technologie: 
Wärmepumpe-System mit Erdwärmekollektoren
Stadt: 
Törökbálint
Heizungsleistung: 
700 kW
Kühlungsleistung: 
760 kW