The purpose of the heat pump system installation is to replace one of gas boilers in the low-temperature heating circuit.
Technical data of the primary circuit: - Primary Collector: two-pipe KPE SDR 11/32 mm, 11 x 100 m - Installation distance: 4 m - Primary spinal cord: dia. 75 mm, leading in 1.7 m-deep trench