School and Sport Centre

There was a state-subsidized heat pump project in Törökbálint in 2010. The design and installation has been made by the HGD Ltd. We joined to Swietelsky Ltd. in the construction and we started to drill 18.000 m BHE system in August 2010. The planned heating and cooling capacity is 700 kW and 760 kW.

Applied technology: 
Heat pump projects (BHE)
City: 
Törökbálint
Heating power: 
700 kW
Cooling power: 
760 kW